![]() ![]() This could include what happens if something gets broken while work is being done or a payment schedule being contingent on getting inspection approvals from Permits & Inspections Division inspectors during the construction phase. If you have any specific requests, put all specific details in a written contract. When hiring a contractor, there are some important tips that you may wish to consider. After all requisite agency inspections are approved a Certificate of Occupancy(C.O.) is issued to occupy the building. Once all construction inspection approvals are obtained, your building permit may be rerouted back through agencies that initially reviewed the application to verify that other aspects of the project are satisfactorily complete and the building is ready for occupancy. Using the system, you can also obtain information about the review status of your permit. ![]() Inspections may be requested using our 24-hour automated inspection scheduling system (SPANLINK) at (804) 646-0770 and using the required inspection codes and instructions or by accessing our Online Permit Portal. After approval, and once the work progresses, it is necessary to request periodic inspections of the work in order to receive approval of the various phases and components of the construction. Once reviewed, permits (if determined to comply with code requirements) are approved to authorize the requested work. However, in certain cases, zoning review may be necessary if the building is located within the City Old & Historic District, in which Commission of Architectural (CAR) review is required. Zoning Staff does not generally review certain applications, such as electrical wiring, heating and air conditioning (HVAC) or roofing installations, which have no impact on the use of the premises. New buildings or additions must also include a survey or site plan (plan of the property showing the location of all improvements in relation to the property lines). A building permit application must indicate the existing and proposed improvements to take place on the property. Zoning Division approval is required for most building permit applications, including interior renovations. Contact the Permits & Inspections Division at (804)646-4169 if you have specific questions on when a building permit is required. North says once they send out the notices to customers, they will start fining people after March 11.Īnd if you receive a fine, expect it to be tacked onto your utility bill.A Building Permit ( B.P.) is a document that permits construction or any change to the use of any property, as determined by the Building Code, including additions and alterations and certain accessory buildings or structures (i.e.: garages, decks, walls, fences, swimming pools, signs, etc.). Those forms can be filled out through the city's department of public works. For example, those who have signed up for back yard service will be exempt as will be elderly or disabled folks who cannot get out to move their cans. She says the city will make some exceptions. North says the city will alert customers by adding a notice to their March utility bill. It keeps trash from being thrown down in the alley." "In fact I'm ok with it being here because I don't mind if people walking through her put their trash in my can. I don't think having mine here near the alley is causing any problem for traffic here," she said. "It's the city putting a burden on the people unnecessarily. Jennifer Spann, who lives on the Northside, says she thinks a $50 fine is ridiculous and unfair. "There's a $50 fee per can per day for every day that you're out of compliance once that letter is issued," North said. If you violate it by leaving your supercan or recycling binds out in a city right of way and you're caught, first you will get a warning sticker on your can and a letter in the mail. Things are about to change for a 2007 city ordinance that was hardly ever enforced because of manpower issues. If they're out on the curb line cars may not be able to park," North explained. "If you have supercans on the sidewalks people may not be able to walk through especially if they're left out there for days on end. North says citizen complaints and safety reasons prompted them to step up enforcement. "You should not put your super can out before 4 pm on the day before your service and it should be removed by 7 am the day after your services," Public Works spokesperson Sharon North told CBS 6 News. ![]() What many people may not know is that if you live within the Richmond city limits, there are only certain hours that you can put the cans out. Now, Richmond officials are pushing to collect fines for those who leave their trash cans in a city right of way. (WTVR) - Leaving your supercan trash cans out for days after the garbage trucks have gone could cost you some money. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |